Correct Answer: C) How the need to manually lift the load could be avoided
Correct Answer: A) No, only a scaffolder can remove the guard-rail and put it back
Correct Answer: D) Send employees for a health survey if the exposure level is below the threshold
Correct Answer: A) No greater than 225 mm
Correct Answer: B) Check that the details in Sections A, B and C are correct before you sign Section D (producer's details)
Correct Answer: C) The principal contractor
Correct Answer: C) Where the work will last longer than 30 days and have more than 20 workers working simultaneously at any point on the project
Correct Answer: B) The electricity supply company
Correct Answer: A) Make sure they get first aid
Correct Answer: C) The sides of the enclosure are bowing in
Correct Answer: A) At all times
Correct Answer: C) Stop and report it immediately to your supervisor
Correct Answer: A) Only if a suitable secure seat is provided for each of them
Correct Answer: D) Stop blocks
Correct Answer: A) Adapt the machines to limit the extension of the jib or boom
Correct Answer: D) It must never be exceeded
Correct Answer: C) When it is being used as a works vehicle
Correct Answer: B) Use dust extraction or wet cut, wear FFP3-rated respiratory protective equipment (RPE), hearing protection and impact goggles
Correct Answer: D) It is not harmful to health
Correct Answer: A) Less than usual
Correct Answer: A) Apply for permission from the local environmental health officer under a Section 61 notice
Correct Answer: B) Apply the handbrake, switch the engine off and remove the key
Correct Answer: D) Every six months
Correct Answer: D) When it is worn over other garments and fastened at the front
Correct Answer: D) Stop and locate the signaller
Correct Answer: B) One mile
Correct Answer: A) Help them to leave the site safely, using the nearest designated exit
Correct Answer: A) Feet slightly apart, one leg slightly forward and knees flexed
Correct Answer: D) Oxygen
Correct Answer: D) Wait or go around, but never walk under a raised load
Correct Answer: D) When you are working over, or near to deep water
Correct Answer: A) Designers and the contractor
Correct Answer: B) The client
Correct Answer: B) Will it make them drowsy or unsafe to work or operate machinery?
Correct Answer: D) Stop dust getting into the air
Correct Answer: A) Check the lift plan or method statement
Correct Answer: D) Ties must have been tested by a competent person