Correct Answer: B) Remove the lagging at least 1 m either side of the work
Correct Answer: C) Use a non-combustible mat and have a fire extinguisher in the immediate work area
Correct Answer: C) It is the maximum safe working load
Correct Answer: C) Ladder clamps
Correct Answer: D) Using a pipe rack fixed to the roof of the van
Correct Answer: D) Use a trolley or other manual handling aid
Correct Answer: A) Can the work be performed from outside?
Correct Answer: C) Use an access scaffold designed for chimney works
Correct Answer: D) A mobile tower or fixed scaffold
Correct Answer: A) If no other suitable equipment is available after works have been risk assessed
Correct Answer: A) A Gas Safe registered engineer
Correct Answer: D) To provide a continuous earth for the pipework installation
Correct Answer: B) Battery-powered drill
Correct Answer: A) A cable tracer
Correct Answer: A) Always, whatever the circumstances
Correct Answer: C) Ear defenders, respiratory protective equipment, boots and eye protection
Correct Answer: D) Wear gloves to avoid direct contact with the skin and read the COSHH assessment
Correct Answer: A) The Health and Safety Executive (HSE)
Correct Answer: A) It should be available in the immediate work area
Correct Answer: B) At least one hour before you leave the site
Correct Answer: B) A hammer and bolster
Correct Answer: D) Use a trolley or other manual handling aid
Correct Answer: A) Can the work be performed from outside?
Correct Answer: A) If no other suitable equipment is available after works have been risk assessed
Correct Answer: C) By not washing your hands before eating
Correct Answer: D) Work in pairs, break the length at the collar and remove the pipe section
Correct Answer: C) Ear defenders
Correct Answer: A) Eye protection with a tinted or filter lens
Correct Answer: A) Always, whatever the circumstances
Correct Answer: D) Gloves, mask and eye protection
Correct Answer: A) They are filled to extremely high pressures
Correct Answer: D) Outside in a special storage compound
Correct Answer: B) At least one hour before leaving the job
Correct Answer: C) Stop what you are doing and get out
Correct Answer: D) Refuse to do the work until the trench sides have been properly shored
Correct Answer: D) Using a pipe rack fixed to the roof of the van
Correct Answer: B) A mobile tower scaffold
Correct Answer: A) Not use the ladder, and report the matter to your supervisor
Correct Answer: B) The work that is subject to the notice must stop until the safety problem is rectified
Correct Answer: A) It should be available in the immediate work area
Correct Answer: C) Stop work and report it
Correct Answer: A) A Gas Safe registered engineer
Correct Answer: D) To provide a continuous earth for the pipework installation
Correct Answer: A) A cable tracer
Correct Answer: C) Outside the cabin
Correct Answer: B) Keep people out of the area and inform your supervisor
Correct Answer: D) Red or orange
Correct Answer: C) Ear defenders, respiratory protective equipment, boots and eye protection
Correct Answer: C) It is the maximum safe working load